If you’re reading this most likely your Loader needs some expert attention. One of the easiest ways to ensure your loader is operating to its full potential is, keep up a good preventative maintenance schedule. Servicing usually consists of 250 hr, 500 hr, 1000 hr & 2000 Hr services. Each having its specific checks, adjustments, filter & oil changes. At each service there could be issues found such as oils leaks, worn components, loose parts & major issues emerging. Ensuring that you get the right professional advice when your machine does breakdown can save a lot of down time and money in costly repairs. DieselWest Recently diagnosed & replaced a Hydrostatic transmission (HST) transmission pump (P/N: 418-18-31102, 418-18-31101) on a Komatsu WA250PT-5H which was replaced onsite.
If you’re looking for expert advice on a Komatsu wheel loader, Call DieselWest to discuss. |